Refer a client and keep the relationship. Every deliverable is ready for your firm to file from, and we stand behind our R&D and 179D studies if the IRS has questions.
Not sure? Refer anyway.We'll tell you and your client what applies.
Use the short form below or email us. It takes two minutes.
You're copied from the first message.
Before any work starts, so you can plan the return around it.
Ready for the return, and our support continues after filing.
Nothing reaches your client's return without you.
Form 6765 completed, with Section G business component detail where required, technical narratives for each qualifying activity, the wage allocation method, and a study report that holds up if the credit is questioned.
Energy model results, the site inspection, the Professional Engineer's certification and Form 7205, plus the allocation letter on designer claims. When the increased deduction is claimed for meeting prevailing wage and apprenticeship requirements, Form 7220 and its payroll and apprenticeship records come with it. It isn't needed when installation began before January 29, 2023.
For buildings your clients own, 179D is evaluated first so the study starts from the right basis. Your client receives an engineering-based report with assets classified by recovery period and depreciation schedules ready for the return, including the catch-up for a building already in service.
For the R&D and 179D work we prepare, studies are built to the evidence standard. If the IRS examines a credit or deduction, we support you through it, and a licensed Professional Engineer answers the technical questions.

Built and led two 179D practices, with hundreds of field inspections and thousands of 179D and R&D studies delivered. Builds the methodology and deliverables behind every aecre study.
Usually the person on the other end of a technical question.

Six years at a major global tax incentive firm, then partner leading growth for an international firm's 179D practice. Nearly a decade educating companies and CPAs on R&D, energy efficiency and other incentives.
Usually your first conversation.
Timing at a glance. Each client's facts decide what applies.
Smaller businesses could elect to deduct domestic research costs from 2022 through 2024 on amended returns, and make a late election to take a reduced R&D credit for those years.
Read the entryThe 179D deduction is not allowed for property whose construction begins after June 30, 2026.
Read the entryIRS Notice 2026-16 gives interim guidance on an elective deduction of 100% of the basis of nonresidential real property used as an integral part of manufacturing, production, or refining.
Read the entryFederal credit by year, from payroll and activities.
Open the calculatorThe deduction for each building, by placed-in-service year.
Open the calculatorFirst-year depreciation with and without a study.
Open the calculatorWhat qualifies, what counts as a cost, and how the credit is claimed.
Read the guideFor building owners and for designers of government and tax-exempt buildings.
Read the guideHow a study works, bonus depreciation, and the catch-up for buildings already in service.
Read the guideFrom dermatology and dental labs to HVAC design, breweries and millwork.
Browse the guidesNo. We reach out only after you refer, within one business day, and you're copied from the first message.
Yes. We don't prepare returns or provide accounting services. We do the study, and you file.
You do. Everything arrives ready for the return you prepare.
For the R&D credit: payroll, project records, and short interviews with the people who did the work. For 179D: drawings, specifications, and access to the building. We give you and your client the list before work starts.
It depends on the incentive and how ready the records are. You see the timeline before work starts and can plan the return around it.
Often. The R&D credit can generally be claimed on amended returns for years still open. A cost segregation study can catch up depreciation missed on a building already in service, without amending past returns.
For buildings owned by government and tax-exempt entities, the owner can allocate the deduction to the designer through a signed allocation letter. We prepare the study and the letter.
A licensed Professional Engineer certifies the energy savings and the inspection.
For the R&D and 179D work we prepare, we support you through the examination and answer the technical questions.
Yes. The calculators give a first estimate, and the full study sets the figures.
Thank you. We'll contact your client within one business day and copy you on the first message.
Book a call to talk about working together. You'll speak with a partner, not a sales team.
Book a Call